Builders
Node Operators
Network Upgrades
Delta

Delta Network Upgrade

The following information is how you can prepare your nodes for the Delta upgrade.

Mainnet Information

⚠️

The Delta mainnet network upgrade is not scheduled yet.

Testnet Information

⚠️
  • The Delta testnet network upgrade for OP Goerli will activate at 1703116800 Thu Dec 21 00:00:00 UTC 2023.
  • The Delta testnet network upgrade for OP Sepolia will activate at 1703203200 Fri Dec 22 00:00:00 UTC 2023.

Required Action

You must upgrade your nodes to the following versions prior to

Verifying Your Configuration on OP Goerli & OP Sepolia

You can verify your node is configured correctly with the following:

  • op-node will log its configuration at startup

OP Goerli

  • Check that Delta time is set to 1703116800 in the op-node logs

OP Sepolia

  • Check that Delta time is set to 1703203200 in the op-node logs

Additional Support

If you require additional support. Please reach out on our developer forum (opens in a new tab) and we'll answer your questions there.